Mostly insulation & some cleanup

Been busy with life in general so progression have been slow in the last few weeks. Most of the time has been spent on continuing to insulate the rest of the house.
Insulating the walls
Insulating the walls has been pretty straightforward. The wood fiber boards that we’re using are good fit between the wall studs and we only have a to do a few cuts per section of wall and work progresses fairly quickly. A bit tricky in a few places where we got plumbing sticking out of the wall but overall pleasant to work with.
Insulating the ceiling
On the second floor (the loft), the 45 degree ceiling was a lot tricker to insulate and required a lot more work. Our intial plan to place the thick wood fiber boards horizontally failed completely and we had to find a different way. After some trial and error we ended up adding additional studs and placing the boards vertically instead. This worked and and after a while we got the speed up on this as well.
There are a total of 11 roof rafters with 1.2m between them. We divided them up with studs and got a total of 22 sections per roof half or a total of 44 sections. Each section took about an hour to insulate with the cuts, and pushing it in place. The total thickness is 315mm which should be enough consider the use of the workshop.
Cleanup
We try to keep the house and work area clean but it’s hard to avoid making a mess. However, every now and then we take the time to clean things up properly and then we can get a glipse of what’s to come.
And last update, we did some more work getting some more facade paneling in placed, specifically on the large doors.